Page Title

Optional description.

Block Type: Content

Heading 2

Heading 3

Heading 4

New Tab Link

Same Tab Link

Link to PDF

Small Caps Header

My Subheading Intro For Content

This is an example of an inline link that you can click on. This is an example of a really long link that will wrap to the second line and still has a correct underline.

Below are shortcodes to make buttons on your site. The “title” sets the text of the button, the “link” is the url that the button links to, the “type” sets the color or style of the button, and “new” will open the button in a new tab if set to “yes”. There are 4 types (dark-green, dark-green-border, green, text). There are 3 modifiers (video, download, small). You can mix modifiers and types. The order of the type and modifier within the “type” attribute does not matter. So type=”green video” is the same as type=”video green”. If a button is placed on a background that is the same color as the button, the button will turn white.

Light Blue Dark-Green Dark-Green-Border Green Text

Video Modifier

Adding “video” to the type will add a play icon to the button, and the button will open in a popup lightbox when clicked.

Dark-Green Dark-Green-Border Green Text

Download Modifier

Adding “download” to the type will add a download icon to the button, and the button link will be downloaded when clicked.

Dark-Green Dark-Green-Border Green Text

Small Modifier

Adding “small” to the type will make the buttons have a smaller height and font size.

Dark-Green Dark-Green-Border Green Text

New Modifier

Adding “new” to the type will make the buttons have a new tab icon and open in a new tab by default (i.e. you do not need to use the new=”yes”).

Dark-Green Dark-Green-Border Green Text

This is an example of a bulleted list.

  • Bullet #1
  • Bullet #2
  • Bullet #3

This is an example of a numbered list.

  1. Numbered #1
  2. Numbered #2
  3. Numbered #3

You can also use a horizontal line to visually divide content sections. The element can be selected from the bar above.


Images are added by selecting the “Add Media” button from above and selecting your preferred image. To style the image click on the image you have added. Click the little pencil “Edit” button. Under “Display Settings” you have alignment options and size options. Sometimes the image will com in small or blurry, change it to a larger size to fix this issue.

Videos can be added by pasting a link from Vimeo, YouTube, etc in the editor.

Block quotes can be added by clicking the quotation mark in the above style toolbar (when in the WordPress editor).

This is an example of a quote or a callout section.

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

Block Type: Table

Optional introduction content. Table is built and maintained via TablePress plugin.

WeekDatesProjectDescriptionNotes:
1April 29-May 3Crew 1: Poor Mountain Relo - Georgia Appalachian Trail Club (GATC) - USAFWork will involve building new AT around Poor Mountain, replacing steep existing trail with sustainable sidehill. Near Helen, GAThis crew week is FULL with airmen from Whiteman AFB (Missouri).
Crew 2: Yellow Mountain Rehab - Nantahala Hiking Club (NHC) - USAFWork includes installing checksteps, increasing drainage, rock cribbing, and defining tread. Near Franklin, NCThis crew week is FULL with airmen from Whiteman AFB (Missouri).
2May 7-11Crew 1: Poor Mountain Relo - Georgia Appalachian Trail Club (GATC)Work will involve building new AT around Poor Mountain, replacing steep existing trail with sustainable sidehill. Near Helen, GA
Crew 2: War Spur Relo - Roanoke Appalachian Trail Club (RATC) (Wilderness)Work will continue on this nearly 1 mile relocation. Project will be constructing brand new sidehill trail at a sustainable grade with few structures. Near Mountain Lake, VAWilderness group size limits only allow 8 volunteers on this crew.
3May 15-19Crew 1: Wilburn Ridge Rehab - Mount Rogers Appalachian Trail Club (MRATC) & HardcoreKonnarock will be partnering up with Hardcore volunteers for a unique crew week installing rock waterbars, steps, and cribbing on a heavily used and gullied section. Near Grayson Highlands State Park, VA.Experienced trail crew volunteers only this week. Krock volunteers will be leading small groups of Hardcore volunteers on small projects.
Crew 2: Chestnut Ridge/Burkes Garden Rehab - Piedmont Appalachian Trail Hikers (PATH)This project includes basic Trail rehab: installing blaze posts along open ridgelines, step construction, and some woody vegetation removal. Near Burkes Garden, VAThis crew week is FULL with volunteers from the Outdoor Club at Virginia Tech (OCVT).
4May 23-27Crew 1: Chatfield Shelter Area Rehab - Piedmont Appalachian Trail Hikers (PATH)This project includes basic Trail rehab: rock step and crib construction, tread definition, and improving drainage. Near Marion, VAThis crew week is FULL with volunteers from University of Central Missouri.
Crew 2: Yellow Mountain Rehab - Nantahala Hiking Club (NHC)This project includes basic Trail rehab: i.e. adding drainage, installing and repairing steps and cribs, and re-digging outsloped tread. Near Franklin, NCThis crew week is FULL with volunteers from University of Central Missouri.
Mid-Season BreakMay 28 - June 2Camp Closed (Exceptions may apply)
5June 3-7Crew 1: Grayson Highlands Rehab - Mount Rogers Appalachian Trail Club (MRATC) (Wilderness)This project includes basic Trail rehab: i.e. adding drainage, installing and repairing steps and cribs, and re-digging outsloped tread. Near Grayson Highlands State Park, VAWilderness group size limits only allow 8 volunteers on this crew.
Crew 2: Greasy Creek Rehab - Tennessee Eastman Hiking and Canoeing Club (TEHCC)This project includes basic Trail rehab: i.e. adding drainage, installing and repairing steps and cribs, and re-digging outsloped tread. Near Erwin, TN
6June 11-15Crew 1: Poor Mountain Relo - Georgia Appalachian Trail Club (GATC)Work will involve building new AT around Poor Mountain, replacing steep existing trail with sustainable sidehill. Near Helen, GA*We are seeking volunteers who can sign up for Weeks 6 & 7 for this GATC project. Volunteers would register for both weeks, June 11-23. The crew stays down in GA over the 3 "off" days.
Crew 2: Greasy Creek Rehab - Tennessee Eastman Hiking and Canoeing Club (TEHCC)This project includes basic Trail rehab: i.e. adding drainage, installing and repairing steps and cribs, and re-digging outsloped tread. Near Erwin, TN
7June 19-23Crew 1: Poor Mountain Relo - Georgia Appalachain Trail Club (GATC)Work will involve building new AT around Poor Mountain, replacing steep existing trail with sustainable sidehill. Near Helen, GA*We are seeking volunteers who can sign up for Weeks 6 & 7 for this GATC project. Volunteers would register for both weeks, June 11-23. The crew stays down in GA over the 3 "off" days.
Crew 2: Greasy Creek Rehab - Tennessee Eastman Hiking and Canoeing Club (TEHCC)This project includes basic Trail rehab: i.e. adding drainage, installing and repairing steps and cribs, and re-digging outsloped tread. Near Erwin, TN
8June 27 - July 1Crew 1: War Spur Relo - Roanoke Appalachian Trail Club (RATC) (Wilderness)Work will continue on this nearly 1 mile relocation. Project will be constructing brand new sidehill trail at a sustainable grade with few structures. Near Mountain Lake, VAWilderness group size limits only allow 8 volunteers on this crew.
Crew 2: Trail Repair/Rehab - Carolina Mountain Club (CMC)Work includes installing checksteps, increasing drainage, installing rock cribbing, and redefining tread.
Mid-Season BreakJuly 2 - 7
9July 8-12Crew 1: Highcock Knob Rehab - Natural Bridge Appalachian Trail Club (NBATC) (Wilderness)Work will include rehabbing current trail that is steep and requires drainage structures, steps, and tread definition. Near Glasgow, VAWilderness group size limits only allow 8 volunteers on this crew.
Crew 2: Trail Repair/Rehab - Carolina Mountain Club (CMC)Work includes installing checksteps, increasing drainage, installing rock cribbing, and redefining tread.
10July 16-20Crew 1: Blackrock Rehab - Natural Bridge Appalachian Trail Club (NBATC)Project will improve a wet area crossing with cribbing and a short boardwalk. Near Buchanan, VAThis crew week is FULL thanks to friends and family of a long-time alumni.
Crew 2: Trail Repair/Rehab - Carolina Mountain Club (CMC)Work includes installing checksteps, increasing drainage, installing rock cribbing, and redefining tread.
11July 24-28Crew 1: North of Cheoah Bald Rehab - Smoky Mountains Hiking Club (SMHC)Work will include installing log and rock steps, and waterbars to address steep sections of trail and the associated erosion. Near Fontana Dam, NC*We are seeking volunteers who can sign up for Weeks 11 & 12 for this SMHC project. Volunteers would register for both weeks, July 24 - August 5. The crew stays down in NC over the 3 "off" days.
Crew 1: War Spur Relo - Roanoke Appalachian Trail Club (RATC)Work will continue on this nearly 1 mile relocation. Project will be constructing brand new sidehill trail at a sustainable grade with few structures. Near Mountain Lake, VAWilderness group size limits only allow 8 volunteers on this crew.
12August 1-5Crew 1: North of Cheoah Bald Rehab - Smoky Mountains Hiking Club (SMHC)Work will include installing log and rock steps, and waterbars to address steep sections of trail and the associated erosion. Near Fontana Dam, NC*We are seeking volunteers who can sign up for Weeks 11 & 12 for this SMHC project. Volunteers would register for both weeks, July 24 - August 5. The crew stays down in NC over the 3 "off" days.
Crew 1: War Spur Relo - Roanoke Appalachian Trail Club (RATC) (Wilderness)Work will continue on this nearly 1 mile relocation. Project will be constructing brand new sidehill trail at a sustainable grade with few structures. Near Mountain Lake, VAWilderness group size limits only allow 8 volunteers on this crew.

Block Type: Timeline

2018

ATC Established

The Appalachian Trail Conference was established on March 2-3, 1925, as a stand-alone organization to take on the work of building Benton Mackaye’s vision for the Appalachian Trail.

2025

ATC Established

The Appalachian Trail Conference was established on March 2-3, 1925, as a stand-alone organization to take on the work of building Benton Mackaye’s vision for the Appalachian Trail.

2020

ATC Established

The Appalachian Trail Conference was established on March 2-3, 1925, as a stand-alone organization to take on the work of building Benton Mackaye’s vision for the Appalachian Trail.

The Appalachian Trail Conference was established on March 2-3, 1925, as a stand-alone organization to take on the work of building Benton Mackaye’s vision for the Appalachian Trail.

Block Type: L/R Content + Image

Optional introduction content.

Optional Section Title

Optional section description.

Button

Block Type: L/R Content + Image

Optional introduction content.

Optional Section Title

Optional section description.

Button

Block Type: L/R Content + Image Callout

Optional section description.

Button

Block Type: L/R Content + Image Callout

Optional section description.

Button

Block Type: Accordions

Optional introduction content.

A nervous wreck.

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi. Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed.

In an elevator.

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi. Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed.

It saw the salad dressing.

Oof what a burn! Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi. Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed.

Block Type: Statistics

Optional introduction content.

1M

Small Description

10K+

Small Description

68%

Small Description. Small Description.

200

Small Description

300

Small description

Block Type: CTA Banner

CTA section description.

Button Secondary Button

Block Type: CTA Banner w/ Image

CTA section description.

Button

Conservation

Block Type: CTA Callout

Callout description.

Block Type: CTA Callout

Callout description.

Block Type: 2 to 3 Column Widgets

Optional introduction content. 3 Column Widgets on display below.

Widget Title

Optional widget description.

Button

Widget Title

Optional widget description.

Button

Widget Title

Optional widget description.

Button

Block Type: 2 to 3 Column Widgets

Optional introduction content. Two column widgets on display below.

Widget Title

Optional widget description.

Button

Widget Title

Optional widget description.

Button

Block Type: 4 Column Widgets

Optional introduction content.

Block Type: Image List

Optional introduction content.

Optional Title

Item content.

Optional Title

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit.

Block Type: Image List

Optional introduction content.

Optional Title

Item content.

Optional Title

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit.

Optional Tag

Block Type: Icon List

Optional introduction content.

Optional Title

Item content.

Learn More

Optional Title

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit.

Learn More

Optional Tag

Block Type: Icon List

Optional introduction content.

Optional Title

Item content.

Learn More

Optional Title

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit.

Learn More
Hiking Tips

Example Post

On 100th Anniversary of ATC’s Founding, Kaine, Tillis, Lawler, and Beyer Introduce Bipartisan Legislation to Protect National Trails Across the U.S.

Read More

Block Type: Logos Grid

Optional introduction content.

Stay Connected

Get the latest A.T. news, events, merchandise, and sneak peeks delivered directly to your inbox.